
Inside the box was another box:

Inside that box:

Thirsty work all this:

Well wrapped:

Finally:

There was a small problem but fantastic service by both John at Track-Shack and Ian at Accucraft resulted in Ian personally dropping off replacement parts at my house and everything was soon sorted.

Its had some running in on the rolling road and there is a marked change in it loosening up. After 6 hours running in she quite happily trundled around with 40 axels behind, quite impressive when you think of the gradients on the West Shropshire Mineral Railway.
There are plans for extra bits of work (lining and RC amongst others) to be carried out on what is already proving to be a powerful addition to the loco roster.
The staff at the MPD are more than happy with their new acquisition and sent her out on a test run with the snow plough the other day:








