Just buying a loco like this is more complicated.
The deal involved having fresh boiler hydraulic and steam tests.
Fortunatley the owner of a nearby miniature railway is also a boiler inspector, so after joining hus model engineering club I was able to arrange the tests.
To do the hydraulic, the safety valves are replaced by blank plugs, all valves closed, the boiler filled right up with water, and a special hand pump used to pressurise. The inspector then checks all visible parts of the boiler and firebox for distortion or weeping while it holds the water pressure.
The working pressure is 90psi, so the hydraulic re-test is to 135psi (original hydraulic was 180psi

).
The loco passed with no issues

This means that the next hydraulic will be needed in November 2020.
The steam test is a bit more complicated;
The water level is reduced to a normal level, the safety valves replaced, a fire lit, and steam raised. Once a good strong fire is up, the blower is put on hard and pressure left to build......
The pressure at which the safety valves start to lift is recorded, and the blower kept wide open, eventually both safeties lift fully (and very noisily as they are pop valves on this loco) and a close watch kept on the pressure gauge.
To pass, pressure must stop rising before 110% of the working pressure.
All good (phew!), which means the paperwork can all be signed and the boiler is all clear for another 12 months: