LNR:119037 wrote:Three departments of the LNR have been quite busy this last week. S&T of course have been getting on with the installation of the signal operating equipment.
WARNING! Signal purists should not read on.
Bit late to this party, as ever these days.
Excellent - I like the McK&H touch of the extra reverse notches in the lever frame.
Now, despite being in the UK, I do have a very complete set of information and operating documents for the VR and NSWGR, and I think you're to be congratulated for getting it to look 'right' signalling-wise. Signalling is often regarded as the ephemeral side of modelling, and often disregarded.
With the dwarf signals and the McK&H there is a lot of common ground with NZGR installations, though of course you'd have No 7 tablets in the signal bay, rather than SLA boxes.
I think his Grace may be interested in Carlsruhe - Daylesford, especially Daylesford
(LINK) and Dookie on the Katamatite branch
(Dookie Link) as well as Merbein on the Mildura - Yelta line
(LINK).
Lest it be forgotten there was also the experiment to do without staffs on the Whitfield branch, and run it with section orders - I have the 1928 GA and it is a phenomenal overcomplication.
Anyhow, well done Grant - nice to see some thought going into signalling modelling.