Page 1 of 1

CLR Road surface and platform surface work

Posted: Sun Sep 07, 2014 3:57 pm
by andymctractor
Been doing some mods to the Crowfoot Light Railway with some roads being constructed of concrete on hard core with coloured (blackish) mortar as final finish.  Also a rebuild of the station platform at Crowfoot Hall stn with the infil made of coloured mortar.

I've used some redundant lawn edging as shuttering.
Image

Not the best photo but the coloured mortar has been applied.
Image

With the shuttering removed we need to let nature do some work and of course the crossing gates and similar need to be built.
Image
These roads can be walked on and will gunge up nicely eventually.

Now for the new platform at Crowfoot Hall Stn.

The white stone wall on the right of this photo was parallel to the track before I tidied up the tracklaying and this shows the extent of the re routing.  The platform on the left is not filled and you can just about see where the old concrete base was that supported the resin 'timber' halt that was the previous platform.
Image

All done and infilled with coloured mortar.  This can also be walked on but as it is part of our dogs garden patrol route, it is not possible to have any knock offable bits on a permanent basis.
Image

Hope this is of interest.

Re: CLR Road surface and platform surface work

Posted: Sun Sep 07, 2014 4:26 pm
by philipy
andymctractor:103971 wrote: Hope this is of interest.
Yes it is Andy, thanks. It's always good to see how others do things and this looks as though it should look really good once nature does it's thing.

Posted: Sun Sep 07, 2014 4:38 pm
by kandnwlr
That´s some serious landscaping there. Next season is going to be something to see :D

A bit more scenic work

Posted: Sun Sep 07, 2014 5:32 pm
by andymctractor
Thanks for comments.
Here you can see Bramley Bank Station in its raw state.  The low walls are the base for our Brandbright station building and the wall on the left wraps round the telephone box.  
I removed a nuisance bush from behind the rock and constructed concrete on hardcore roadway but decided here not to top it with coloured mortar.  Top right of the photo you can see the passing river (slate chippings) being held back by a dam made of Filcris and some left over lawn edging.  I need to plan some structures, possibly industrial or a water mill or something to front off the concrete gravel board at the base of the fence.  I will also surface the platform area in front of the buildings to cover the bricks currently in view.    
Image

Posted: Sun Sep 07, 2014 6:18 pm
by steamie1
Gives me inspiration to crack on with the D.L.R. extension

Posted: Sun Sep 07, 2014 9:30 pm
by Peter Butler
Most impressive! It will mellow in time and look even better.
What adhesive have you used to bond the building blocks together?

Posted: Sun Sep 07, 2014 11:21 pm
by andymctractor
Peter Butler:103986 wrote:What adhesive have you used to bond the building blocks together?
Neat SBR

Posted: Mon Sep 08, 2014 9:20 am
by KNO3
Very nice. What is that bonsai tree next to your foundation?

Posted: Mon Sep 08, 2014 10:38 am
by andymctractor
KNO3:103993 wrote:Very nice. What is that bonsai tree next to your foundation?
My wife thinks this is an Acer. We have two other Acers in the garden but they struggle a bit because we don't have the right soil. I don't know if this is a more tolerant version. It was well cut back at the same time as digging out the nuisance bush. Hopefully it won't get too woody as time goes on.