Re: Nolwyn Valley Tramway

Posted: Wed Mar 20, 2024 12:58 pm
by philipy
Thanks Drew, it could be useful. I've seen a couple of other comments on the subject so it could be of wider interest. I tried using Giphy when I did a fly-round of my Gmeinder loco drawings, but I wasn't sure if you gif-ised a video or did it directly using stills.

Re: Nolwyn Valley Tramway

Posted: Wed Mar 20, 2024 3:10 pm
by Lonsdaler
I would be a +1 for the gif tutorial, even for uses outside the forum.👍🏻

Re: Nolwyn Valley Tramway

Posted: Thu Mar 21, 2024 7:22 am
by FWLR
+2 also. :thumbright:

Re: Nolwyn Valley Tramway

Posted: Fri Mar 22, 2024 5:58 pm
by drewzero1
Spring snow caught the NVT off-guard last night, and a pair of slate wagons wait at the halt for the melt.
Screenshot_20240322-115658.jpg
Screenshot_20240322-115658.jpg (1.38 MiB) Viewed 1770 times
The wagons are full of slate chips from the local landscaping supplier. I was there this week getting some info on stones for the front wall... Next I need to do some measuring and math. (And digging, always digging!)

I started working on the GIF tutorial last night... It's pretty simple, but I wanted to put in some screenshots so I'll try and finish it over the weekend.

Re: Nolwyn Valley Tramway

Posted: Sat Mar 23, 2024 7:32 am
by FWLR
Wow, that's a bit of a shock. Looks nice though. :thumbright:

Looking forward to the tutorial, I tried to make one using giphy, I got a trial clip and it works on my laptop, but it won't load onto the forum. Tried 'Add Files' and 'Link' but it just doesn't like it, must be doing something not right... :scratch:

Re: Nolwyn Valley Tramway

Posted: Sat Mar 23, 2024 12:59 pm
by drewzero1
A bit surprising, but not unheard of around here. We often have overnight snow showers through April so I could see us getting one or two more by the end of the season. The small controller was beyond excited, asking me to hook up the sled train (both kids' sleds coupled together) and make tracks and switches all over the yard. :)

Re: Nolwyn Valley Tramway

Posted: Sun Mar 31, 2024 12:28 am
by dudeface
Yay, things are happening! Can't say that about my railway.

Re: Nolwyn Valley Tramway

Posted: Sun Mar 31, 2024 3:22 am
by drewzero1
dudeface wrote: Sun Mar 31, 2024 12:28 am Yay, things are happening! Can't say that about my railway.
Yeah, and it only took me a year and, what, six pages of spinning my wheels and overthinking everything? :roll:

I try not to compare projects though... Everybody's got different goals and different circumstances!

Re: Nolwyn Valley Tramway

Posted: Mon Apr 01, 2024 2:42 am
by dudeface
drewzero1 wrote: Sun Mar 31, 2024 3:22 am Yeah, and it only took me a year and, what, six pages of spinning my wheels and overthinking everything? :roll:
Hopefully I don't make it to six... :lol:

Re: Nolwyn Valley Tramway

Posted: Fri Apr 05, 2024 3:21 pm
by drewzero1
What a wild week it's been! The snow melted enough over the weekend that I was able to dig in some big stones for footers under most of the front wall on Monday...
Screenshot_20240405-085431__01.jpg
Screenshot_20240405-085431__01.jpg (725.48 KiB) Viewed 1551 times
But then throughout Tuesday and Wednesday we had freezing rain turning to 5-6 inches of snow on top. Roads were slick, shoveling was heavy, and progress on any groundworks was out of the question.
Screenshot_20240405-085509__01.jpg
Screenshot_20240405-085509__01.jpg (426.59 KiB) Viewed 1551 times
(Gee, this looks familiar from a couple of posts ago, but it's all new snow!)

While unable to progress outside I've been trying to fettle some stock to make sure I'll have something to run when the line is eventually complete. I needed to add some buffer beams to lower the couplings on my Southwold short van, and with the printer still on break I fashioned a set out of popsicle (lolly?) sticks, cup hooks, and roofing nails for the buffers.
Screenshot_20240405-091441__01.jpg
Screenshot_20240405-091441__01.jpg (337.02 KiB) Viewed 1551 times
It still could use some tweaking but I'm happy enough with the result for now.

Re: Nolwyn Valley Tramway

Posted: Sun Apr 07, 2024 4:43 am
by drewzero1
philipy wrote: Wed Mar 20, 2024 12:58 pm Thanks Drew, it could be useful. I've seen a couple of other comments on the subject so it could be of wider interest. I tried using Giphy when I did a fly-round of my Gmeinder loco drawings, but I wasn't sure if you gif-ised a video or did it directly using stills.
Lonsdaler wrote: Wed Mar 20, 2024 3:10 pm I would be a +1 for the gif tutorial, even for uses outside the forum.👍🏻
FWLR wrote: Thu Mar 21, 2024 7:22 am +2 also. :thumbright:
Sorry for the delay! I've finished it- see HOW TO: Gif-izing a video

Re: Nolwyn Valley Tramway

Posted: Sun Apr 07, 2024 5:52 am
by philipy
drewzero1 wrote: Sun Apr 07, 2024 4:43 am
Sorry for the delay! I've finished it- see HOW TO: Gif-izing a video
Thanks Drew.
Although I managed to do a very simple version for my coupling gif, I never managed to work out how to get the resizing etc to work, so this looks very helpful.

Re: Nolwyn Valley Tramway

Posted: Thu Apr 11, 2024 9:59 am
by Old Man Aaron
Hard to beat those hooks for couplings. I use 'em on everything.

Re: Nolwyn Valley Tramway

Posted: Thu Apr 11, 2024 2:29 pm
by drewzero1
Old Man Aaron wrote: Thu Apr 11, 2024 9:59 am Hard to beat those hooks for couplings. I use 'em on everything.
I've seen them used for couplings before but never tried them for myself. My local hardware store is closing them out at eight for a dollar so I think I'd better stock up while they're still there, and the nails were a few cents for a handful (priced by the pound--0.05lb).

I do anticipate moving away from chain coupling at some point for ease of operation, but since phase 1 is just a simple loop I probably won't be doing enough shunting to make it tedious yet.

Re: Nolwyn Valley Tramway

Posted: Sat Apr 13, 2024 7:16 am
by drewzero1
Small milestone achieved tonight as the waterfall operates successfully! A new spillway was needed as the first time I tried starting the pump all of the water was flowing out between the ponds. :shock: Protective mesh has also been cut and awaits edging.
Screenshot_20240412-234141.jpg
Screenshot_20240412-234141.jpg (354.41 KiB) Viewed 1411 times
No news on the track unfortunately. The front half of the raised bed can't be properly graded until the front wall is complete. I still have to go buy that box of rocks I must've been dumber than to start this project in the first place! :bom:

Re: Nolwyn Valley Tramway

Posted: Sun Apr 14, 2024 6:03 am
by FWLR
Well I think it's going to be brilliant Drew. It's a long journey sometimes to get to something we are happy with, and then I don't think we are all of us, happy are we with want we end up with, there is always something or another that we think needs doing to improve it. :thumbright:

Carry on Drew and in the end it will be something to be proud of I am certain of that... :thumbright: :thumbright:

Re: Nolwyn Valley Tramway

Posted: Thu May 02, 2024 7:51 am
by drewzero1
Experiments in tracklaying:
Screenshot_20240502-013533.jpg
Screenshot_20240502-013533.jpg (358.92 KiB) Viewed 519 times
Roughly the same location as the first image in this thread. Finally feels like we're getting somewhere!

Re: Nolwyn Valley Tramway

Posted: Thu May 02, 2024 7:54 am
by philipy
drewzero1 wrote: Thu May 02, 2024 7:51 am Experiments in tracklaying:


Roughly the same location as the first image in this thread. Finally feels like we're getting somewhere!
Thats a nice picture Drew. Its always a good feeling when you realise that you are actually getting to where you want to be.

Re: Nolwyn Valley Tramway

Posted: Thu May 02, 2024 8:09 am
by FWLR
Brilliant Drew. It's worth all the effort when you see a scene like this. Wont be that long before you have the line complete, but then comes the rest of it, buildings, rolling stock, people....etc etc.

Looking forward to more photos and updates. :thumbright:

Re: Nolwyn Valley Tramway

Posted: Fri May 10, 2024 7:21 pm
by drewzero1
Thanks Rod and Philip, I appreciate the encouragement! Really helps keep me going when things don't go as planned, or as quickly as planned...

After a few rains, the ballast has settled in a bit and the track seems stable. I'm still trying to decide how best to pin it down to keep it from getting ripped up by kids and squirrels, but still allow for maintenance and modification.
Screenshot_20240510-111020.jpg
Screenshot_20240510-111020.jpg (428.83 KiB) Viewed 104 times
Somehow I felt I didn't have quite enough stock for the six feet of track I've laid so far, so I knocked together a three-plank wagon out of popsicle sticks. This is larger than the two quarry wagons, which look a bit silly behind the big diesel I've been working on...
Screenshot_20240510-110617.jpg
Screenshot_20240510-110617.jpg (572.45 KiB) Viewed 104 times
Speaking of that project, here is that diesel. Meet Rhydderch/Roderick, printed in October and built in fits and spurts since then.
Screenshot_20240501-024322.jpg
Screenshot_20240501-024322.jpg (616.43 KiB) Viewed 104 times
He was originally planned around a scavenged 14v cordless drill motor and gearbox, but that turned out to be a poor match for the 12v drill battery (scavenged from a different drill). I've since taken the 25mm 6v gear motor out of Thornas for the diesel, and I'll be replacing it with something smaller for Thornas-- more on that later.