Reconstruction of the upper loop of the ANLR
-
SillyBilly
-
laalratty
Yes you do, i've just had an email from cecil asking when you are coming
Could you please tell me what you are doing, as I will have no transport because my dad is working and my mum is going off on holiday with riveresk on Sunday, so I will only have transport on the Saturday
Back on topic, tracklaying for the upper loop was completed today so that there would be a continuos run for sillybilly's visit, now I must get the garden as tidy as possible
Could you please tell me what you are doing, as I will have no transport because my dad is working and my mum is going off on holiday with riveresk on Sunday, so I will only have transport on the Saturday
Back on topic, tracklaying for the upper loop was completed today so that there would be a continuos run for sillybilly's visit, now I must get the garden as tidy as possible
-
laalratty
-
ptlrcecil
Hey scots guardsman has been seen and caught on youtube on one of its trials recently although I cant remmeber how to find the vid.laalratty wrote:Thanks![]()
going rather off topic saw Sir Lamiel at Carnforth and watched them shunting coaches, presumerbly desperatly trying to get enough space available for the open weekend!!!
-
laalratty
Have seen the vid I think, and seen the pics, for the past couple of weeks its been out on Thursdays on test
Dad has laready managed to ballast a lot of the new trackwork, today there was also the start of casting concrete for the new upper station, although further progress was halted by lack of materials!
Dad has laready managed to ballast a lot of the new trackwork, today there was also the start of casting concrete for the new upper station, although further progress was halted by lack of materials!
- Chris Cairns
- Driver

- Posts: 2372
- Joined: Mon Oct 29, 2007 7:25 pm
- Location: Glasgow, Scotland
Just typed 'Scots Guardsman' in the Search box and came up with these 2 -although I cant remmeber how to find the vid.
http://www.youtube.com/watch?v=dnN6zdw0wEM Load Test through Preston.
http://www.youtube.com/watch?v=GsG3cNHvycE It's last journey in 1966.
-
SillyBilly
-
MuzTrem
-
laalratty
Dragging this back on topic, last night the first train ran on the reconstructed upper loop, hauled by PTLRcecils Caradoc. Sillybilly also visited with Isabelle and Ina but unfortunatly only this picture of Caradoc is of good enough quality to put on t'net

Later on we ran Isabelle and my Caradoc double headed but by then it was virtually dark so no pictures
With thanks to PTLRcecil and SillyBilly for braving the at times torrential rain, now I just have to finish the project off

Later on we ran Isabelle and my Caradoc double headed but by then it was virtually dark so no pictures
With thanks to PTLRcecil and SillyBilly for braving the at times torrential rain, now I just have to finish the project off
-
laalratty
Here is the last update on this for over a week as i am going on holiday. Track has been laid for the western end of Nant Llywyd stations loop and one of the sidings

You will also notice that the tunnel has a plastic sheet on it, this is because the first part of the tunnels roof has been mortard in place, ie the tunnel is now a tunnel again (the plastic sheet was to keep the still wet mortar dry in case of rain.

looking the other way, the trackbed for the rest of the loop and sidings is virtually complete, tracklaying for this will be completed when I get back from holiday

You will also notice that the tunnel has a plastic sheet on it, this is because the first part of the tunnels roof has been mortard in place, ie the tunnel is now a tunnel again (the plastic sheet was to keep the still wet mortar dry in case of rain.

looking the other way, the trackbed for the rest of the loop and sidings is virtually complete, tracklaying for this will be completed when I get back from holiday
-
laalratty
Well first full day back home and the loop for Nant Llywyd station is complete, with a siding needing laying at the easten end of the loop before starting on trackbed for the quarry area.

Going to Wales allowed me to aquire (*cough* take) some pieces of slate for the scenery of the new section, the idea being to try and replicate a slate tip around the quarry

Going to Wales allowed me to aquire (*cough* take) some pieces of slate for the scenery of the new section, the idea being to try and replicate a slate tip around the quarry
-
laalratty
yep, although some of my line and 2 yards of the platform road is tenmille, and just to add variety there is some mamod, hornby tinplate and regauged triang going into the mostly decorative quarry area (basically anything I can get free or cheapmhlr wrote:Peco Sm32...ACLR wrote:thats looking great mate.
what track are you using ???
-
laalratty
Work has continued on this slowly, after having 2 weeks watching the Olympics and finishing the new coach I pushed on with the trackbed for the quarry area, which now looks like this

Work has also happened on the tunnel, with a hole being bored in the roof sections so that I can put in a ventalation shaft!

Work has also happened on the tunnel, with a hole being bored in the roof sections so that I can put in a ventalation shaft!
- TonyW
- Driver

- Posts: 1357
- Joined: Fri May 16, 2008 9:25 am
- Location: North Wales
- Contact:
How have you fixed the track to the top of the concrete blocks?
Tony Willmore
Rhos Helyg Locomotive Works: http://www.rhoshelyg.me.uk
Facebook: https://www.facebook.com/RhosHelygLocoWorks
Rhos Helyg Locomotive Works: http://www.rhoshelyg.me.uk
Facebook: https://www.facebook.com/RhosHelygLocoWorks
Who is online
Users browsing this forum: No registered users and 23 guests

