MHLR Extension

What is your latest project?
DLRdan

Post by DLRdan » Tue May 12, 2009 11:31 pm

i meant how long before a TRAIN goes for a bath not you


judging by the smell i dont think youve ever had a bath

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Wed May 13, 2009 12:12 am

DLRdan wrote:i meant how long before a TRAIN goes for a bath not you


judging by the smell i dont think youve ever had a bath
Pardon???

And the trains will have a fence dont you worry!
Image

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Wed May 13, 2009 8:31 pm

Right, I've got it all done now, just need to lay the track, and fit a fence around the inner part of the pond next! Oh, and after, the halt and a jetty.

Image
Image

ACLR

Post by ACLR » Thu May 14, 2009 9:58 pm

thats looking great :D

Sammmm

Post by Sammmm » Fri May 15, 2009 11:04 pm

Very Very nice! :) sorry lol been wathcing the progress for a while lol
only just decided to join the forums

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Fri May 15, 2009 11:08 pm

Thanks Sam, Welcome to the forum! :D
Image

SillyBilly

Post by SillyBilly » Fri May 15, 2009 11:23 pm

Good to see another new member, a warm welcome from Wales.

ACLR

Post by ACLR » Fri May 15, 2009 11:39 pm

yes welcome Sam

Sammmm

Post by Sammmm » Sat May 16, 2009 10:41 pm

:D thanks to peter im modding/customising my edrig quickly lol

just need a name for it soon might give it the name of old dog we used to have 'Prince' lol

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Thu Jun 11, 2009 10:51 pm

Taddar!!! Spent all of today (9am to 10pm!!) laying the track on the extension, making a permanent (maybe left there though  :lol: ) bridge, and building the wire fence around the inner edge of the pond to stop any unwanted disasters! Anyway, it isnt finished yet... tomorrow I'm going up' Cambourne to buy some new points as the second hand ones I bought as a job lot with the track are all pretty crap, so it will be case of fitting those tomorrow. Then after that, it will be ballasting, details etc.

Image

The pond, now all filled up thanks to the hose pipe left on for a few hours! The pump still needs to be connected up though.

Image

Bridge infront of the waterfall, with a fence that seems a bit wonky.

Image

The first train EVER onto the extension. There's no more pics etc, because it kept derailing over the points, and it was dark by the time I'd fixed them enough to go over at a slow speed!
Image

User avatar
andysleigh
Driver
Driver
Posts: 1362
Joined: Thu Oct 18, 2007 6:21 pm
Location: Guildford
Contact:

Post by andysleigh » Thu Jun 11, 2009 10:59 pm

Looks brill Pete!

cant wait to hopefuly visit one day :P
Image

laalratty

Post by laalratty » Thu Jun 11, 2009 11:01 pm

Looks fantastic to me, that bridge is surely going to become a photographers favorite view, the garden bits already look pretty good as well. Nice work :)

SillyBilly

Post by SillyBilly » Thu Jun 11, 2009 11:07 pm

I'm sure you could make a nice bridge, griders or something, to match the niceness of the whole new section it looks really good.

LMS-Jools

Post by LMS-Jools » Fri Jun 12, 2009 8:27 am

Excellent :lol:

Matt

Post by Matt » Fri Jun 12, 2009 8:49 am

great work there. For the bridge, why not get a girder bridge from Brandbright?

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Fri Jun 12, 2009 1:49 pm

The bridge is a difficult one, because it has to be at an angle across the gap, and wide enough to take a curve of track (so the radius is not too tight either side), so it has to be a flat deck. I will probably make one some time, but I've got other things I need to do before I change the bridge. It will also be hard to fit now all the water is in the pond, access is limited.
Image

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Tue Jun 16, 2009 12:45 am

Because of my stupidity, this is what happens when it has just rained (and its the 3rd attempt, first time I tried to get up it, she failed):

<embed width="448" height="361" type="application/x-shockwave-flash" wmode="transparent" src="http://s221.photobucket.com/flash/playe ... v"></embed>
Image

User avatar
andysleigh
Driver
Driver
Posts: 1362
Joined: Thu Oct 18, 2007 6:21 pm
Location: Guildford
Contact:

Post by andysleigh » Tue Jun 16, 2009 12:47 am

Nice bit of grade

I feel a stema banker is in need :happy3:
Image

Matt

Post by Matt » Tue Jun 16, 2009 8:19 am

How steep is that gradient?

If it's a permanent feature, your defiantly going to need a banker.

mhlr
Retired Director
Retired Director
Posts: 4336
Joined: Sun Oct 21, 2007 8:16 pm
Location: Shropshire, England

Post by mhlr » Tue Jun 16, 2009 12:11 pm

Matt wrote:If it's a permanent feature, your defiantly going to need a banker.
After it has rained or snowed, yes!
Image

Post Reply

Who is online

Users browsing this forum: No registered users and 16 guests