
I will post one of latest work at some point, although surfice to say it looks a lot better than it did when it was just a wooden board on top of my tunnel!
The track in the quarry has also no been connected to the rest of the railway, with the installation on a mamod point, donated by SLRmidge

I now have a little plea, if anyone has 3 or 4 lengths of straight mamod track they would like to get rid of, could you pm me as I would like to put in a short siding off the remaining leg of the point, without wanting to do any more work to make that leg suitable for peco sm32 (I have already spent a lot of time modifying that point for use)






