On the workbench at the mo' I have (simultaneously)
The second of the IP freelance 2 comp rake being built as a Brake/3rd
Some seated passengers for the above
An ACME "Steam Sound" unit being fitted to the GRS Bagnall
An ACME arc welder unit being assembled with "the worker"
A Binnie skip
The Loscoe Home Starter signal
Three Accucraft vans and a brakevan having their 3 link centre buffers fitted and W&L transfers applied
While out in the shed I've prepared a master mould ready for pouring low melt rubber for a stone wall section mould
and meanwhile on the coffee table there are the plans for creating a new street scene on the Westwood & Loscoe
And they say that women are best at multi-tasking!
I've just told SWMBO to sit down and stop complaining. Can she do it? (No chance!)
