The Hollycross Railway Company!

A place for the discussion of garden railways and any garden style/scale portable and/or indoor layouts
jim@NAL
Driver
Driver
Posts: 1115
Joined: Sun Sep 23, 2012 11:01 am
Location: haverhill suffok

Post by jim@NAL » Wed Aug 10, 2016 7:33 pm

this is great looking very good looking forward too seeing this progress

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Post by pippindoo » Thu Aug 11, 2016 6:37 pm

More progress today, getting the other end of the present line ready to cross the path. First off, a quick review of yesterdays efforts.
Image
Its rained overnight but everything looks good and Ive got a reference for the pier I'll be putting in today. First job, build the pier and get it set in position, in POSTMIX again, and checking its level and inline with the existing trackbed.
Image
Image
The reversing line comes in very close to this pier so a PECO small radius point was chosen along with matching curves to cut out any problems with dogleg joints in flexitrack, and maintain an even curve. The filcris again went together very easily, Im very impressed, and it wasnt long before the trackbed was taking shape. Single posts were put in around 2 feet apart with the outer rail set a couple of millimetres higher to give a bit of cant and aid progress around the sharp curves. Wheeeee!!!
Image
Image
Again lots of level checking and rail level sighting to get things nice and straight.
It seemed to go relatively easy and soon I had things well sorted and a complete connection. The diesel was fired up to do a few test runs and apart from a slight deviation where the filcris meets the blocks, my fault, I was knelt on the string line!, its looking fine and dandy!
Image
Image
Super elevation I believe?..... Dee Dah....
Image

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Post by Soar Valley Light » Thu Aug 11, 2016 7:49 pm

Great (and rapid) work, lovely to see such good workamnship.

I agree with everything Pipindo says about Filris. I'll be very interested to know if the elevated sections suffer from expansion problems. As Pip say, it IS very flexible and boy don't it expand! I'm burying all mine to shade it from the heat. It means most of the railway will be on embankments but it looks ok so far - even without tyrack on it!

Keep us posted on progress.
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

User avatar
LNR
Driver
Driver
Posts: 1533
Joined: Sat Feb 27, 2016 5:26 am
Location: Australia

Post by LNR » Fri Aug 12, 2016 1:09 am

Sorry, had to chuckle about kneeling on the string line, been there done that.
As Andrew has said very nice neat work Pipp, the branch will make for interesting working.
Grant.

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Post by pippindoo » Sat Aug 13, 2016 8:55 pm

Image


With NOBBY leading, the Down Evening Mixed swings away from Hollycross, closely followed by DELILAH with a motley collection of wagons. Well...I can dream a bit...  :?
SAM_1130_800x600_640x480.JPG
SAM_1130_800x600_640x480.JPG (341.62 KiB) Viewed 6284 times
Last edited by pippindoo on Tue Sep 18, 2018 6:02 am, edited 4 times in total.

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Post by Soar Valley Light » Sat Aug 13, 2016 9:27 pm

Very nice Pipp, that's a beautiful loco and it looks great heading through the greenery!

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Post by pippindoo » Sun Aug 14, 2016 12:05 pm

Thanks again Andrew, locos were despatched off to Rhos Helyg for R/C fitting, any other work, and repainting and lining, and I can't recommend Tony's work high enough. Further developments this morning included sorting out the realignment of the outer platform line to ease the connection back onto the main line. This involved dropping a trimmed block into the gap, set as ever in POSTMIX, before going to ASDA. Upon my return an hour later, the track was slewed across, secured, and a new (old!) section dropped in to complete the connection. The diesel did half a dozen passes without incident, and it was signed off by the Pway gang, or at least it will be when they return from the Railway Tavern. Hopefully!
IMG_20171016_151610_640x480.jpg [attachment=0]IMG_20171016_152041_640x480.jpg
Attachments
IMG_20171016_151610_640x480.jpg
IMG_20171016_151610_640x480.jpg (416.25 KiB) Viewed 6283 times
IMG_20171016_152041_640x480.jpg
IMG_20171016_152041_640x480.jpg (376.26 KiB) Viewed 6283 times
Last edited by pippindoo on Tue Sep 18, 2018 6:12 am, edited 3 times in total.

User avatar
ge_rik
Administrator
Administrator
Posts: 6497
Joined: Sun Oct 25, 2009 10:20 pm
Location: Cheshire
Contact:

Post by ge_rik » Sun Aug 14, 2016 6:04 pm

Looking great already. Certainly helps when the planting is already well established.

Rik
------------------------
Peckforton Light Railway - Blog Facebook Youtube

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Sun Apr 02, 2017 12:13 pm

Greetings from the Hollycross Railway Company!! First off, my apologies for the long absence just as progress and interest was bumbling along in tandem, Im back now though and ready to begin the next part of construction, though as some of you may recall, my methodology is somewhat 'unusual' so if anyone who was previously duped 8) into believing I plan everything meticulously, it may be best to look away now!
Right, we have 2 sayings in Yorkshire, one is 'Ey up cock!', the other is 'OW MUCH?!', so when Lord Hollycross approaches anything like this, its very much what was good enough for the Romans, its quite good enough for him, Thank you very much! So...

String, in balls, very cheap, very useful and if its pulled tight, very straight and level!....so, if for instance, you tied one end of your string to a sleeper end....
SAM_1887.JPG
SAM_1887.JPG (696.97 KiB) Viewed 7554 times
....then walk along, keeping it tight against the railhead....
SAM_1888.JPG
SAM_1888.JPG (739.48 KiB) Viewed 7554 times
....pulled it tight, looking along it to make sure its straight....
SAM_1889.JPG
SAM_1889.JPG (743.4 KiB) Viewed 7554 times
....then pinned it to a fence, for example....
SAM_1890.JPG
SAM_1890.JPG (729.88 KiB) Viewed 7554 times
.... You'd end up with a straight and in-line string line! Fun isn't it? So lets do it again then, from the other side of the gap!
SAM_1891.JPG
SAM_1891.JPG (697 KiB) Viewed 7554 times
SAM_1892.JPG
SAM_1892.JPG (778.37 KiB) Viewed 7554 times
SAM_1893.JPG
SAM_1893.JPG (717.34 KiB) Viewed 7554 times
SAM_1894.JPG
SAM_1894.JPG (691.3 KiB) Viewed 7554 times
....still with me? So now we've got 2 in-line string lines from either end of a gap, and a fence that wont blow down cos its tied to our railway....lets join em up....
SAM_1895.JPG
SAM_1895.JPG (717.27 KiB) Viewed 7554 times
....and....
SAM_1897.JPG
SAM_1897.JPG (746.46 KiB) Viewed 7554 times
Wey Hey Missus!! The wooden rail has been secured between 2 fence posts to help keep things stable, but it really DID end up almost perfectly level!
And thus, Lord Hollycross's team ended up with a well surveyed, non engineered plan, which provided a line of route for the rest of the circuit, an ideal spot for a steam up area/siding area and most importantly, pork pie and beer bottle storage area, and under the shade of the trees. Right, me and the team are off to the Railway Tavern for some recuperation whilst you re-read it all in absolute disbelief and wonder however it all works! It has so far though, and it will. More later, Cheers chaps! :shock:
One more shot, because every garden railway project needs a train piccie
so, below, we catch intrepid Top Link Hollycross driver Albert 'Oi loikes t' go faaast' Bracegirdle and his regular steed NOBBY, trundling past with hopper wagons and wondering why there's string hung everywhere, and what was that loud TWANG!......
Last edited by pippindoo on Mon Oct 16, 2017 4:57 pm, edited 4 times in total.

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Sun Apr 02, 2017 12:16 pm

SAM_1900.JPG
SAM_1900.JPG (705.96 KiB) Viewed 7554 times

jim@NAL
Driver
Driver
Posts: 1115
Joined: Sun Sep 23, 2012 11:01 am
Location: haverhill suffok

Re: The Hollycross Railway Company!

Post by jim@NAL » Sun Apr 02, 2017 8:36 pm

this is all brilliant looks like you have had a busy weekend nice weather for it too great use of a string line

User avatar
LNR
Driver
Driver
Posts: 1533
Joined: Sat Feb 27, 2016 5:26 am
Location: Australia

Re: The Hollycross Railway Company!

Post by LNR » Mon Apr 03, 2017 12:24 am

Still laughing about Albert and the "Twang", in fact the whole story. Good to see you back at it.
Grant.

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Mon Apr 03, 2017 7:44 am

Albert! NO!! I really don't care how much you 'can back up a bit!'......
SAM_1901.JPG
SAM_1901.JPG (737.07 KiB) Viewed 7833 times
Last edited by pippindoo on Wed Mar 01, 2023 9:25 am, edited 1 time in total.

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Re: The Hollycross Railway Company!

Post by Soar Valley Light » Thu Apr 06, 2017 8:48 pm

Great update Pippindo.

How is the Filcris doing on the warm days? Mine is all at ground level and will be buried, even on embankments. The recent warm days have resulted in some movement due to expansion of those areas as yet unburied. I notice a significant proportion of yours is up in the air, so I imagine the problem could be more noticeable. That said your construction is much more rigid than mine, I'm just using runners held with 400mm long posts at 900mm centres and spacer blocks half way between, no top boards like yours and only single posts too. It's cracking stuff though and worth every penny. I've even ordered some bigger sections for other gardening jobs. You're right about the service from Filcris - it's second to none!

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

User avatar
tom_tom_go
Driver
Driver
Posts: 4824
Joined: Wed Feb 23, 2011 3:08 am
Location: Kent, UK
Contact:

Re: The Hollycross Railway Company!

Post by tom_tom_go » Sat Apr 08, 2017 3:11 pm

This is a great thread, love the style so keep us updated please.

I took the plunge with Flicris recently for a non-garden railway project and was very pleased with the service although it is not cheap and they charge for delivery as the material comes direct from Germany by road.

The more popular it get's, the cheaper it will become...

User avatar
LNR
Driver
Driver
Posts: 1533
Joined: Sat Feb 27, 2016 5:26 am
Location: Australia

Re: The Hollycross Railway Company!

Post by LNR » Sun Apr 09, 2017 4:28 am

Is that Albert's leap of faith!!! "I loikes to fly too". Love the look on his face, I'm sure I can do this"
Grant.

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Mon Apr 10, 2017 7:08 am

Prior to early retirement, I had 31 years train driving and met so many 'characters', dedicated and true railwaymen but absolute nutters some of them! I want to remember some of them at Hollycross and more will appear in due course with stories of unbelievable derring-do attached........
Filcris is brilliant! Its very easy to work with, its flexibility makes it so but CAN also be tricky but I've found that with enough support it soon firms up and haven't yet noticed any problems at all, including expansion Andrew. I did note last summer that the rail joints closed up in hot weather, as I'd expect, but nothing more. I've placed my upright supports at roughly 2 foot intervals, and on the new raised section will use a two-legged support every 6 foot or so for extra stability. The top boards help take out any slight irregularities and will have low sidewalls attached on the high sections, just in case Albert's ever late for his tea!

User avatar
Soar Valley Light
Driver
Driver
Posts: 1451
Joined: Sun Dec 08, 2013 5:18 pm
Location: North West Leicestershire

Re: The Hollycross Railway Company!

Post by Soar Valley Light » Tue Apr 11, 2017 8:06 pm

I look forward to future posts, especially if it involves recollections from the good old days. Whereabouts were you based?

I strongly suspect the rigidity of your track bed is down to the top boards. I've done a good deal more filling up around my construction and there are no further signs of movement. Mind you, it has been much cooler and I was away during the red hot weather after Saturday. I'll post updates if that situation changes.

I look forward to seeing more of your railway, it looks very intersting.

All the best,

Andrew
"Smith! Why do you only come to work four days a week?
"'cause I can't manage on three gaffer!"

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Wed Apr 12, 2017 12:50 am

Spent most of my railway career based at Leeds Andrew, including 4 years as an Instructor/Assessor before returning to the footplate for a last spell at Harrogate. I then retired, sort of.......
14389529254_503f9799a6_o.jpg
14389529254_503f9799a6_o.jpg (173.1 KiB) Viewed 7462 times
I'm the clean one, front right, and my steed for this trip from Carlisle to York is 37516 Loch Laidon, tucked in behind the 8F. I'm currently playing bus drivers with FIRST, again in Leeds!
Yes, the top boards on the track bed definately do tie everything together and stop a lot of the twisting. I usually fasten each of them with 2 screws initially so the Filcris can sort of find its own level as I progress, then I go back and add another 2 screws to each top piece and it all locks solid.

User avatar
pippindoo
Trainee Fireman
Trainee Fireman
Posts: 144
Joined: Sun Nov 14, 2010 9:01 pm
Location: Leeds
Contact:

Re: The Hollycross Railway Company!

Post by pippindoo » Wed Apr 12, 2017 10:58 am

Yesterdays project was getting the steaming bay area in place. Its of timber construction for stability, with roofing felt for added protection, and will see the main circuit running at the back and 1, maybe 2 sidings inside for loco preparation etc. The gangers are aware that theres a tree ever so slightly in the way, and consulted Lord Hollycross about the problem. As ever, his solution was entirely practical and straightforward, " Aye lads, but it's a big b*gger an' it'd take some shifting. Nah, leave it be!" Job sorted! You'll see that the Filcris top framework is already in place, secured where it needs to be, and my next task is 2 'oles, 2 legs, 2 shovels of POSTMIX, then coffee and a doughnut! :thumbup:
Note the simple string line to which everything has been matched!
SAM_1955.JPG
SAM_1955.JPG (343.27 KiB) Viewed 7422 times
SAM_1962~2.JPG
SAM_1962~2.JPG (120.43 KiB) Viewed 7422 times
SAM_1958~2.JPG
SAM_1958~2.JPG (211.77 KiB) Viewed 7422 times
Some matching paving will be put in front of the steaming bay and the lawn and flower beds tidyed up after to keep things nice.
Last edited by pippindoo on Fri Apr 14, 2017 5:07 am, edited 2 times in total.

Post Reply

Who is online

Users browsing this forum: No registered users and 4 guests